Terms and Conditions for the Supply of Services

1. Parties, Definitions and Interpretation

In these terms and conditions (which are referred to in this document as “these terms”), “Customer” means the customer for whom the Works are to be carried out by SAMI BOY PLUMBING AND HEATING, “SAMI BOY PLUMBING AND HEATING” means Samiboy Plumbing and Heating Ltd (“SAMIBOY”) or, as the case may be, a franchisee of SAMIBOY carrying on business pursuant to a Franchise Licence Agreement entered into with SAMIBOY, “Contract” means the agreement between the Customer and SAMI BOY PLUMBING AND HEATING to carry out the Works of which these terms form a part and (where these terms are a schedule to a signed agreement between the Customer and SAMI BOY PLUMBING AND HEATING) that agreement, “Works” means the works described in SAMI BOY PLUMBING AND HEATING’s estimate and/or as referred to in SAMI BOY PLUMBING AND HEATING’s Work Detail Sheet or any other document or email issued by SAMI BOY PLUMBING AND HEATING, as may be varied by agreement in writing between the parties. For the purposes of these terms, “in writing” and “written” include by email and any document which is set out in a hand held device and any signature on a hand held screen shall be treated as in writing. In these terms words importing the masculine gender also include the neuter and the feminine gender and words importing the singular number include also the plural number, where the context so requires.

2. General

2.1 All estimates given by SAMI BOY PLUMBING AND HEATING, all orders and instructions given by the Customer, and all work authorisations, are governed by these terms. They supersede any other terms appearing elsewhere and override and exclude any other terms stipulated or incorporated or referred to by the Customer, whether in the order or instructions or in any negotiations or in any course of dealing established between SAMI BOY PLUMBING AND HEATING and the Customer, except where these terms are a schedule to a signed agreement between the Customer and SAMI BOY PLUMBING AND HEATING, in which event these terms apply only to the extent not inconsistent with that agreement.

2.2 The Customer acknowledges that SAMI BOY PLUMBING AND HEATING has not made any representations (other than any expressly stated in the Contract and/or in SAMI BOY PLUMBING AND HEATING’s estimate) which have induced it to enter into the Contract and the Contract shall constitute the entire understanding between the Customer and SAMI BOY PLUMBING AND HEATING for the performance of the Works.

2.3 No modification to the Contract shall be effective unless made by an express written agreement or email exchange between the parties. The signing on behalf of SAMI BOY PLUMBING AND HEATING of any documentation of the Customer shall not imply any modification of the Contract.

2.4 Nothing in this Contract is intended to confer on any person any right to enforce any term which that person would not have but for The Contracts (Rights of Third Parties) Act 1999. Accordingly, a person who is not a party to this Contract shall have no rights under that Act to enforce any of its terms, but this does not affect any right or remedy of such person which exists or is available apart from that Act.

3. The Price, Estimates and Variations

3.1 Unless SAMI BOY PLUMBING AND HEATING provides the Customer with a written estimate which is accepted by the Customer in accordance with its terms, all Works will be charged on the basis of SAMI BOY PLUMBING AND HEATING’s standard Rate Card applicable at the time the Works are carried out.

3.2 Any estimate by SAMI BOY PLUMBING AND HEATING is subject to withdrawal by SAMI BOY PLUMBING AND HEATING at any time before receipt of an unqualified acceptance from the Customer and shall be deemed to be withdrawn unless so accepted within 30 days from its date.

3.3 Where SAMI BOY PLUMBING AND HEATING provides the Customer with an estimate which is accepted by the Customer in accordance with its terms, that estimate is a firm, fixed price quotation unless otherwise specified by SAMI BOY PLUMBING AND HEATING in the estimate and also except as follows:

3.3.1 an estimate is based on the information made available to SAMI BOY PLUMBING AND HEATING by the Customer. If during the conduct of the Works it becomes apparent to SAMI BOY PLUMBING AND HEATING that that information was either incorrect or insufficient in any respect that SAMI BOY PLUMBING AND HEATING considers to be material, SAMI BOY PLUMBING AND HEATING reserves the right to inform the Customer and to increase the estimated price to take account of the revised information; and

3.3.2 if prior to carrying out the Works, there is an increase to SAMI BOY PLUMBING AND HEATING of more than 10% in the cost of any relevant parts, materials or other items, equipment hire or transport since the date upon which SAMI BOY PLUMBING AND HEATING’s estimate was provided, SAMI BOY PLUMBING AND HEATING reserves the right to inform the Customer and to provide a revised estimate incorporating that increase. In this event, the revised estimate will apply unless the Customer cancels the Contract before the Works are begun or, if earlier, within 48 hours of the revised estimate being provided.

3.4 For materials, parts or other items that are not carried as part of SAMI BOY PLUMBING AND HEATING’s standard van stock, unless it is with respect to Works for which there is an estimate which includes all collection fees, SAMI BOY PLUMBING AND HEATING charges a fixed collection fee of £50 plus VAT. Where an item is not easily sourced or generally held by the major suppliers used by SAMI BOY PLUMBING AND HEATING and it considers that significant time will need to be spent tracing and then collecting it, SAMI BOY PLUMBING AND HEATING will inform the Customer in advance and, unless the Customer sources the item itself, this will be charged on a time basis as per SAMI BOY PLUMBING AND HEATING’s standard Rate Card. It should be noted that this is an infrequent occurrence.

3.5 SAMI BOY PLUMBING AND HEATING’s standard Rate Card is available for inspection both on SAMI BOY PLUMBING AND HEATING’s website (www.samiboy.co.uk) and at SAMI BOY PLUMBING AND HEATING’s premises during normal business hours. The Rate Card specifies half hourly rates. There is a minimum charge of one hour. Subject to that, charges are made by the half hour, rounded up to the next half hour.

3.6 Unless otherwise stated, the price and all estimates provided by SAMI BOY PLUMBING AND HEATING are shown exclusive of Value Added Tax which will be payable in addition, where properly chargeable.

3.7 If the Works involve a diagnostic process to ascertain the cause or source of a fault or breakdown and during that process an item is ascertained by SAMI BOY PLUMBING AND HEATING to be faulty and is replaced, the Customer will be liable to pay for that replacement even if the breakdown was caused in whole or in part by a different fault.

3.8 SAMI BOY PLUMBING AND HEATING will be entitled, in accordance with market practice, to charge a mark-up on any parts, materials and other items supplied by it. The mark-up will reflect, at SAMI BOY PLUMBING AND HEATING’s sole discretion, the level of trade or other discount that SAMI BOY PLUMBING AND HEATING was able to obtain from the relevant supplier.

4. Payment and Title

4.1 Payment by the Customer is due on completion of the Works. Payment must be made on such completion.

4.2 Snagging: Where the Works have been completed subject to snagging, 95% of all amounts outstanding must be paid on such completion and the Customer must provide access to SAMI BOY PLUMBING AND HEATING without delay to enable the snagging to be finalised. The balance of 5% will become payable upon the finalisation of the snagging or, if access has not been made available to carry out the snagging within 14 days of completion, at the expiry of such 14 day period.

4.3 Where the Customer is represented by a third party (such as a managing agent, tenant or other occupier, contractor or other representative), in the event of non-payment by the Customer, the third party will be responsible for payment unless SAMI BOY PLUMBING AND HEATING has agreed otherwise in writing.

4.4 In the case of consumer Customers, SAMI BOY PLUMBING AND HEATING shall be entitled to interest on a daily basis on any amount not paid on the due date for payment from such due date until payment in full at 4% above the Bank of England base rate at the relevant time together with such charges as may be incurred by any collection agent appointed by SAMI BOY PLUMBING AND HEATING (with a minimum of £40 plus VAT in the case of amounts below £1,000 and a minimum of £75 plus VAT in the case of amounts of £1,000 or more). In the case of commercial Customers, SAMI BOY PLUMBING AND HEATING will apply all relevant interest and charges as applicable under the Late Payment of Commercial Debts (Interest) Act 1998 as amended and supplemented from time to time by Government legislation or regulation.

4.5 SAMI BOY PLUMBING AND HEATING shall not be required to issue or deliver any certificates, guarantees or other similar documents regarding the Works until payment has been made in full.

4.6 Title in all parts, materials and other items supplied by SAMI BOY PLUMBING AND HEATING shall not pass to the Customer until payment for the Works has been made in full.

5. The Works

All descriptions, illustrations, etc. contained in any catalogues, price lists or advertisements, or otherwise communicated to the Customer, are intended merely to present a general idea of the Works and nothing contained in any of them shall form a part of the Contract.

6. Commencement and Completion Dates

Dates specified for the commencement and completion of the Works are estimates only. SAMI BOY PLUMBING AND HEATING shall use all reasonable endeavours to ensure that it will attend on the date and time agreed. However, it accepts no liability in respect of non attendance or late attendance on site or for the late or non-delivery of materials. Time shall not be of the essence of the Contract except as provided in paragraph 15 below.

7. Permits, Licences, other Consents and Access

7.1 It is the responsibility of the Customer to obtain all permits, licences and other consents in connection with the Works unless SAMI BOY PLUMBING AND HEATING agrees otherwise in writing. The Customer shall provide clear access to enable SAMI BOY PLUMBING AND HEATING to undertake the Works and will make all necessary arrangements with the proper persons or authorities for any traffic controls and signals required in connection with the carrying out of the Works.

7.2 The Customer will at all times provide a safe working environment for SAMI BOY PLUMBING AND HEATING and its employees, agents and sub-contractors for the purposes of carrying out the Works. SAMI BOY PLUMBING AND HEATING will not be required to enter any property when they are occupied but the only occupant is a minor.

7.3 The Customer will provide all necessary power and a clean water supply for SAMI BOY PLUMBING AND HEATING’s use in the execution of the Works.

7.4 Where applicable to drainage works, the Customer will provide, if possible, a plan showing drain layouts. If this is not available, SAMI BOY PLUMBING AND HEATING reserves the right to render additional charges at the relevant applicable rate in accordance with paragraph 3 above if a blockage occurs in drains not covered by the specifications or if it is necessary to trace unidentified drains to complete the Works.

7.5 The Customer must obtain any permission for SAMI BOY PLUMBING AND HEATING to proceed over property belonging to third parties if this is necessary for the proper execution of the Works and shall obtain any permission necessary to carry out work on property belonging to third parties. The Customer shall indemnify SAMI BOY PLUMBING AND HEATING against all claims of whatsoever nature made by such third parties arising out of the presence of SAMI BOY PLUMBING AND HEATING its employees, agents or sub-contractors on the Customer’s or such third parties’ property save where such claim results directly from negligence on SAMI BOY PLUMBING AND HEATING’s part. The Customer shall be liable to SAMI BOY PLUMBING AND HEATING for all loss or damage whether direct, indirect or consequential which is suffered by SAMI BOY PLUMBING AND HEATING as a result of failure or delay by the Customer in performing the obligations referred to in this paragraph.

7.6 All fixtures and fittings in working areas shall be removed by the Customer before commencement of the Works at the Customer’s expense. SAMI BOY PLUMBING AND HEATING may remove at the Customer’s expense any fixtures and fittings not so removed but it will not be responsible for any damage to any fixture or fitting so removed other than damage proved to be caused by SAMI BOY PLUMBING AND HEATING’s negligence.

8. Frozen Pipes

SAMI BOY PLUMBING AND HEATING will not be liable for any fracture found in frozen pipes attended by SAMI BOY PLUMBING AND HEATING. SAMI BOY PLUMBING AND HEATING will not guarantee to clear blockages occurring in a frozen pipe or drain.

9. Removal of Waste Materials

Unless agreed in writing between the parties, the Customer will be responsible for the removal from site of all waste materials resulting from the Works.

10. Force Majeure

SAMI BOY PLUMBING AND HEATING will use all reasonable endeavours to carry out the Works on the agreed dates but shall not be under any liability to the Customer if it should be either impossible or impracticable to carry out the Works on the agreed dates or at all, by reason of strike, lock out, industrial dispute, act of God or any other event or occurrence beyond SAMI BOY PLUMBING AND HEATING’s control.

11. Inspection of Works and Complaints Procedure

11.1 The Customer shall inspect the Works as far as it is reasonably possible to do so immediately upon their completion (though failure to countersign the relevant Works Detail Sheet shall not imply rejection of the Works) and, if it considers that the Works or any part thereof are not in accordance with the Contract, it shall within 7 days from the date of inspection give detailed notice in writing thereof. In the absence of any such notice, the Works shall be conclusively presumed to be complete and free from any defect which would be apparent on reasonable examination.

11.2 If the Customer gives SAMI BOY PLUMBING AND HEATING a notice that the works or any part thereof are not in accordance with the Contract, as per paragraph 11.1 above, SAMI BOY PLUMBING AND HEATING shall be given access the site to examine the complaint and, if SAMI BOY PLUMBING AND HEATING agrees that the Works were not completed in accordance with the Contract, to make good, at SAMI BOY PLUMBING AND HEATING’S own cost and expense, any defect. If SAMI BOY PLUMBING AND HEATING does not agree with the Customer’s complaint, the Customer shall be entitled to refer the matter to the relevant trade accreditation body (of which a list is maintained on SAMI BOY PLUMBING AND HEATING’s website), with a view to mediation in accordance with the recommendations of the body, failing which the Customer shall be deemed to have withdrawn its complaint and shall be obliged to make payment in full for the Works in accordance with paragraph 4 above. If the Customer involves a third party contractor prior to giving SAMI BOY PLUMBING AND HEATING a reasonable opportunity to correct any agreed defect or prior to exhausting the procedure recommended by the relevant accreditation body, any such involvement shall be at the Customer’s own cost and expense and SAMI BOY PLUMBING AND HEATING shall be entitled to payment in full in accordance with paragraph 4 above.

12. Defects

12.1 Subject to paragraph 11 above and the exclusions listed in paragraph 12.4 below, SAMI BOY PLUMBING AND HEATING undertakes to repair or make good any defect in completed work which appears within 12 months of completion of the same to the extent that such defect arises from a breach of SAMI BOY PLUMBING AND HEATING’s obligations under the Contract and provided that details of the defect are notified by the Customer to SAMI BOY PLUMBING AND HEATING in writing within such period and that SAMI BOY PLUMBING AND HEATING and its insurers are given the opportunity of inspecting the work and the alleged defect. This undertaking shall only apply to work carried out and completed and invoiced by SAMI BOY PLUMBING AND HEATING and which is paid for by the Customer by the due date for payment ascertained in accordance with paragraph 4 above.

12.2 If SAMI BOY PLUMBING AND HEATING returns to the site at the Customer’s request to review a claim under this undertaking and it transpires that the defect had not arisen as a result of a breach of the Contract on the part of SAMI BOY PLUMBING AND HEATING, SAMI BOY PLUMBING AND HEATING reserves the right to charge the Customer for the visit at its standard rate as per paragraph 3 above.

12.3 SAMI BOY PLUMBING AND HEATING reserves the right not to carry out any work under this paragraph 12 where the Customer cannot evidence that the work was originally carried out and completed by SAMI BOY PLUMBING AND HEATING or where payment has not been made in full for such work.

12.4 The exclusions referred to in paragraph 12.1 above are:
– Parts, materials and other items will be provided only with the benefit of the manufacturer’s and/or supplier’s guarantee, to the extent available and are not guaranteed by SAMI BOY PLUMBING AND HEATING.
– Systems or structures not installed by SAMI BOY PLUMBING AND HEATING.
– Any recall arising from circumstances or factors known to the Customer but not notified or disclosed to SAMI BOY PLUMBING AND HEATING prior to the work having been undertaken.
– Defects resulting from misuse, willful act, or faulty workmanship by the Customer or anyone working for or under the direction of the Customer (other than SAMI BOY PLUMBING AND HEATING).
– Structural defects encompassing but not limited to subsidence and its resultant effect.
– Damage to drainage systems caused by root penetration or any other outside force.
– Any roofing work where SAMI BOY PLUMBING AND HEATING advises that the overall condition of the roof is poor and is in need of more extensive work and the work to be undertaken involves less than 20% of the area of the roof.
– Any work to repair an existing lock, or to fit any lock not supplied by SAMI BOY PLUMBING AND HEATING.

13. SAMI BOY PLUMBING AND HEATING’s Liability

13.1 These terms set out SAMI BOY PLUMBING AND HEATING’s entire liability in respect of the Works and SAMI BOY PLUMBING AND HEATING’s liability under them shall be in lieu and to the exclusion of all other warranties, conditions, terms and liabilities, expressed or implied, in respect of the Works and the quality thereof.

13.2 SAMI BOY PLUMBING AND HEATING’s liability shall be limited to:
– The repair or making good of any defect pursuant to its undertaking in paragraph 12 above and subject always to paragraph 11 above.
– Liability for death or personal injury resulting from negligence in the course of carrying out SAMI BOY PLUMBING AND HEATING’s duties.
– The reasonable costs of repair or reinstatement of any loss or damage to the Customer’s property if such loss or damage results from SAMI BOY PLUMBING AND HEATING’s negligence or that of its employees, agents or sub-contractors and the Customer incurs such costs.

13.3 SAMI BOY PLUMBING AND HEATING will not be responsible for damage suffered to a part of the Customer’s property (whether or not SAMI BOY PLUMBING AND HEATING is working on that part) where that damage is in whole or in part a consequence of a defect or weakness in that part of the property.

14. Customer’s Liability

14.1 The Customer shall, in addition to its liability under paragraph 7.5 above and paragraph 15.1 below, be liable for:
– Any loss, damage or injury, whether direct, indirect or consequential, resulting from failure or delay in the performance of the Customer’s obligations in connection with the Contract.
– The safety of both plant and machinery belonging to or hired in by SAMI BOY PLUMBING AND HEATING or its employees, agents or sub-contractors and shall indemnify SAMI BOY PLUMBING AND HEATING against its loss, theft or damage.

14.2 The Customer shall indemnify SAMI BOY PLUMBING AND HEATING against all actions, suits, claims, demands, losses, charges, costs and expenses which SAMI BOY PLUMBING AND HEATING may suffer or incur resulting from a failure or delay in the performance of the Customer’s obligations, undertakings, representations or warranties in connection with the Contract.

15. Cancellation

15.1 If the Customer cancels the Contract without SAMI BOY PLUMBING AND HEATING’s agreement other than pursuant to paragraph 3.3 above, subject to paragraph 15.3 below, the Customer shall indemnify SAMI BOY PLUMBING AND HEATING against all loss, damage, claims or actions arising out of such cancellation unless otherwise agreed in writing, and for the avoidance of doubt any such cancellation is without prejudice to SAMI BOY PLUMBING AND HEATING’s right to payment in accordance with paragraph 4 above or to the cancellation charges pursuant to paragraph 15.4 below.

15.2 If the Customer wishes to cancel an appointment for a visit by SAMI BOY PLUMBING AND HEATING, the Customer will incur a cancellation fee of £50 (plus VAT) if the cancellation is made 2 hours or less before the scheduled appointment time unless the SAMI BOY PLUMBING AND HEATING engineer has arrived on site before notice of the cancellation is received by SAMI BOY PLUMBING AND HEATING, in which event the Customer will be liable to pay a charge for one hour at the appropriate SAMI BOY PLUMBING AND HEATING rate.

15.3 The Customer will be entitled to the following cooling off period: The period will apply with respect to planned non-emergency Works for which SAMI BOY PLUMBING AND HEATING has provided a written estimate which has been accepted by the Customer in writing and the contract price of the estimated Works exceeds £1,000. The period will be for a period of 14 days following the day of the Customer’s acceptance of the estimate, and the Customer may at any time during that period by written notice to SAMI BOY PLUMBING AND HEATING cancel the Works without any charge or penalty, subject to the cancellation charges referred to in paragraph 15.4 below and to the Works not having already commenced (with the agreement of the Customer).

15.4 When the Customer cancels Works, unless the cancellation is pursuant to paragraph 3.3 above, the Customer will be liable for (i) as a contribution to the bank and credit card charges incurred by SAMI BOY PLUMBING AND HEATING, 5% of any amount already paid to SAMI BOY PLUMBING AND HEATING and which is to be refunded by SAMI BOY PLUMBING AND HEATING, and (ii) as a contribution to the administration, demobilisation and other costs incurred by SAMI BOY PLUMBING AND HEATING, a charge of £50 (plus VAT) except that if greater, the charge is 5% of the estimate price if the cancellation is made less than 14 days prior to the specified commencement date for the Works, 10% of the estimate price if the cancellation is made less than 7 days prior to the said specified commencement date and 20% of the estimate price if the cancellation is made less than 2 days prior to the said specified commencement date.

16. Waiver, Variation etc.

No waiver by SAMI BOY PLUMBING AND HEATING of any breach by the Customer shall operate as a waiver of any preceding or subsequent breach by the Customer. No variation shall be effective against SAMI BOY PLUMBING AND HEATING unless sanctioned in writing by SAMI BOY PLUMBING AND HEATING. No forbearance or delay on SAMI BOY PLUMBING AND HEATING’s part shall prejudice SAMI BOY PLUMBING AND HEATING’s rights and remedies under this Contract.